holoTalk with Holo
FunctionalityTesting & sampling

Testing & sampling

Automate the work from sampling to test-result review

Generate sampling work orders, import test results and keep accountable review connected to fields, crops and sources.

Explore the workflow ↓
Review water-test records by source, sample date and laboratory.
Review water-test records by source, sample date and laboratory.Demo data · Open image to inspect

How the workflow connects

Generate sampling work orders, import test results and keep accountable review connected to fields, crops and sources.

01

Generate sampling work orders

Use the configured programme and crop schedule to create sampling work with the right location and timing.

02

Connect laboratory results

Automate imports and match results to the relevant crop, field, sample or water source.

03

Cover agronomy and food safety

Keep soil and plant-analysis context alongside water and tissue pathogen testing, including pre-harvest and post-harvest tests for STEC, E. coli O157:H7 and Salmonella.

04

Keep review accountable

Retain signatures and timestamps with test results and work orders so evidence does not have to be assembled separately.

Keep soil-test records linked to ranch, field and sample.
Keep soil-test records linked to ranch, field and sample.Demo data · Open image to inspect

One connected platform

Keep the next decision connected

Testing is part of a workflow: the sample, result, review and any operational restriction should remain connected.

See Holo work for your operation

Walk through testing & sampling with your team’s crops, workflows and priorities in mind.

Talk with Holo ↗